Journal of Electrical Engineering and Automation. 2025; 4: (5) ; 10.12208/j.jeea.20250178 .

Analysis on key factors causing schedule delays in photovoltaic power plant construction projects and optimization countermeasures
光伏电站建设项目进度延误关键因素分析与优化对策研究

作者: 匡亮 *

华光环保能源(西安)设计研究院有限公司无锡分公司 江苏无锡

*通讯作者: 匡亮,单位:华光环保能源(西安)设计研究院有限公司无锡分公司 江苏无锡;

引用本文: 匡亮 光伏电站建设项目进度延误关键因素分析与优化对策研究[J]. 电气工程与自动化, 2025; 4: (5) : 84-86.
Published: 2025/5/21 10:30:16

摘要

光伏电站建设项目在近几年得到了广泛的发展,但其项目进度的延误问题一直存在,严重影响了项目的经济效益与市场发展。本文通过对光伏电站建设项目进度延误的关键因素进行深入分析,识别出技术、管理、环境等方面的障碍。基于这些因素,提出了优化对策,旨在提高项目的进度管理水平,减少延误情况的发生。通过案例分析,本文展示了有效的优化措施,如合理的项目规划、优化资源配置、加强技术支持与管理手段的提升等。本研究为光伏电站建设提供了一套可行的优化方案,为行业的发展提供理论指导。

关键词: 光伏电站;项目进度;延误因素;优化对策;管理

Abstract

Photovoltaic power plant construction projects have developed extensively in recent years, but the problem of project schedule delays has persisted, seriously affecting the economic benefits and market development of the projects. This paper conducts an in-depth analysis of the key factors causing schedule delays in photovoltaic power plant construction projects, identifying obstacles in aspects such as technology, management, and the environment. Based on these factors, optimization countermeasures are proposed to improve the level of project schedule management and reduce the occurrence of delays. Through case studies, this paper demonstrates effective optimization measures, such as reasonable project planning, optimized resource allocation, enhanced technical support, and improved management methods. This study provides a set of feasible optimization schemes for photovoltaic power plant construction and offers theoretical guidance for the development of the industry.

Key words: Photovoltaic power plant; Project schedule; Delay factors; Optimization countermeasures; Manage-ment

参考文献 References

[1] 江倩倩,赵延君,杨雪娜,等. 光伏电站用地对生态环境的影响与解决策略[J].资源节约与环保,2025,(06):97-100.

[2] 覃祚权. 山地光伏电站建设IPD管理模式应用探索[J].中国电力企业管理,2025,(18):46-47.

[3] 李斌华. 地面农业光伏电站土建工程施工技术研究[J].科技资讯,2025,23(02):103-105.

[4] 王丽敏. 光伏电站工程建设项目策略研究[J].建材发展导向,2024,22(18):47-49.

[5] 曹晨光. 区域光伏电站的建设与管理案例分析[J].电子技术,2024,53(07):100-101.

[6] 邓钰暄,冯晓丽,孙仁金,等. 光伏电站建设项目内部基准收益率测算[J].油气与新能源,2024,36(03):66-69+85.

[7] 邓文忠. 光伏电站工程在建筑项目工程中的应用研究[J].中国住宅设施,2023,(12):1-3.

[8] 陈开超. 山地集中式光伏电站建设浅析[J].红水河,2023, 42(06):47-51.