Journal of Engineering Research
Journal of Engineering Research. 2025; 4: (7) ; 10.12208/j.jer.20250330 .
总浏览量: 140
四川骥行工程项目管理有限公司 四川成都
*通讯作者: 何鑫,单位:四川骥行工程项目管理有限公司 四川成都;
本文针对深埋长隧洞中盾构掘进机(TBM)施工效率受多因素影响的问题,采用多变量关联分析方法,系统研究了地质条件、施工参数及设备状态等关键因素对TBM效率的综合作用机制。通过实地数据采集与统计分析,揭示了影响施工进度的主要瓶颈,为提高深埋长隧洞TBM施工效率提供理论支持和优化建议,助力工程安全与经济效益的双重提升。
This paper addresses the issue of multi-factor influences on the construction efficiency of Tunnel Boring Machines (TBM) in deep-buried long tunnels. Using multivariate correlation analysis, it systematically investigates the combined effects of key factors such as geological conditions, construction parameters, and equipment status on TBM efficiency. Through field data collection and statistical analysis, the study identifies the main bottlenecks affecting construction progress, providing theoretical support and optimization recommendations to enhance TBM efficiency in deep-buried long tunnels, thereby promoting both engineering safety and economic benefits.
[1] 许增培,饶明明,桂欣.引调水工程深埋长隧洞施工方案与施工方法选择[J].四川水利,2025,46(03):78-81+88.
[2] 朱文斌.某深埋TBM引水隧洞堵水灌浆施工研究[J].广东水利水电,2025,(01):75-80.
[3] 叶焰中,高健,罗来辉,等.城市深埋隧洞TBM施工超前地质预报体系及应用[J].人民长江,2024,55(S1):59-62.
[4] 肖逸飞.深埋长引水隧洞TBM施工通风方案与装备研究[J].水利技术监督,2024,(04):291-294.
[5] 沈健.深埋长隧洞施工安全监测[J].人民珠江,2023, 44(S1): 166-170.
[6] 吕斌,邱道宏,杨修,等.深埋长距离引水隧洞敞开式TBM施工不良地质灾害处置措施研究[J].水利规划与设计,2022,(11):121-125.
[7] 蔺凤林.深埋长隧洞岩爆及断层区域地质特征及施工方法[J].水利规划与设计,2022,(07):153-158.
[8] 高涛,赵宁.深埋长隧洞软岩大变形控制措施[J].云南水力发电,2022,38(06):193-197.