Journal of Electrical Engineering and Automation. 2025; 4: (3) ; 10.12208/j.jeea.20250088 .

Research on construction quality control and fine management of communication pipeline
通信管道施工质量控制与精细化管理研究

作者: 匡琦骏 *

上海共联通信信息发展有限公司 上海

*通讯作者: 匡琦骏,单位:上海共联通信信息发展有限公司 上海;

引用本文: 匡琦骏 通信管道施工质量控制与精细化管理研究[J]. 电气工程与自动化, 2025; 4: (3) : 93-96.
Published: 2025/3/19 11:35:32

摘要

市政工程建设规模持续扩大,通信管道作为城市基础设施的重要组成部分,其施工质量直接影响通信网络稳定性和市政工程进度。本文针对当前通信管道施工中普遍存在的渗漏水及人孔砌筑不达标等质量问题,系统分析传统工艺缺陷与特殊地段技术方案不足及交叉施工标准缺失等质量影响因素。研究提出“五线法”空间控制与砌筑样板段引路和不锈钢预埋件应用等精细化管理方案,形成可量化的质量控制标准,该方法有效提升管道施工合格率,为同类市政工程中的通信设施建设提供技术参考和管理范式。

关键词: 通信管道施工;质量控制;精细化管理;市政工程;五线法

Abstract

The scale of municipal engineering construction continues to expand. As an important part of urban infrastructure, the construction quality of communication pipeline directly affects the stability of communication network and the progress of municipal engineering. In this paper, aiming at the common quality problems such as water leakage and substandard manhole masonry in the current communication pipeline construction, the quality influencing factors such as traditional process defects, insufficient technical scheme in special sections and lack of cross-construction standards are systematically analyzed. The refined management scheme of "five-line method" for space control, guide of masonry model section and application of stainless steel embedded parts is studied and put forward, which forms a quantifiable quality control standard. This method effectively improves the qualified rate of pipeline construction and provides technical reference and management paradigm for the construction of communication facilities in similar municipal projects.

Key words: Communication pipeline construction; Quality control; Fine management; Municipal engineering; Five-line method

参考文献 References

[1] 沈阳.管道线缆布放机在通信线缆工程施工中的效率提升研究[J].中华建设,2024,(10):74-76.

[2] 侯安杰.探究通信管道光缆线路施工及质检关键技术[J].中国信息界,2024,(01):218-221.

[3] 程勇.中央空调安装质量控制要点——以上海百隆家具项目为例[J].建设监理,2022,(05):80-83.

[4] 郭琦.综合业务接入机房地线引入与通信管道的同步施工探讨[J].江西通信科技,2021,(01):32-34.

[5] 肖立坚.试论通信管道光缆线路施工和质量控制[J].决策探索(中),2020,(01):32-33.