随着工程总承包(EPC)模式在建筑领域的广泛应用,其项目管理面临着复杂的风险挑战。EPC项目由于涵盖了设计、采购和施工的全过程,涉及多方合作和高度依赖的外部因素,风险管理变得尤为重要。本文主要探讨了在EPC模式下,如何识别、评估及应对项目中的各种风险,并提出了一系列有效的风险管理策略。通过风险识别、定量分析、合同管理、以及风险分担等方面的综合运用,项目管理者能够有效降低潜在的风险影响,确保项目按时、按质完成。最后,本文强调了在EPC项目中,团队协作和信息共享对于风险控制的关键作用。
With the widespread application of the Engineering Procurement Construction (EPC) mode in the construction field, its project management is faced with complex risk challenges. Since EPC projects cover the entire process of design, procurement, and construction and involve multi-party cooperation and highly dependent external factors, risk management has become particularly important. This paper mainly explores how to identify, evaluate, and respond to various risks in EPC projects and proposes a series of effective risk management strategies. Through the comprehensive application of risk identification, quantitative analysis, contract management, and risk sharing, project managers can effectively reduce the impact of potential risks and ensure the timely and high-quality completion of projects. Finally, this paper emphasizes the crucial role of team collaboration and information sharing in risk control in EPC projects.
[1] 吴永光.工程总承包(EPC)模式下的施工风险协同管理机制[C]//重庆市大数据和人工智能产业协会,西南大学,重庆工商大学,重庆建筑编辑部.人工智能与经济工程发展学术研讨会论文集.中建四局土木工程有限公司;2025: 708-711.
[2] 梁宝衡.EPC模式下城市更新工程总承包项目造价监管环节存在的风险及控制对策[J].中华民居,2024,17(08): 115-117.
[3] 刘玲.EPC工程总承包模式下的项目管理与风险控制[J].今日财富,2024,(25):122-124.
[4] 蒋昱垚.联合体EPC模式下建设工程总承包项目风险分析及管控措施[J].建筑设计管理,2024,41(08):46-50.
[5] 李雪冰.EPC模式下工程总承包企业的造价和成本管控[J].活力,2023,41(17):151-153.
[6] 胡锦程.M公司工程总承包模式下项目风险管理改进研究[D].内蒙古大学,2023.
[7] 杨哲琰.工程总承包项目EPC模式下建筑企业财务管理现状及对策探讨[J].企业改革与管理,2022,(16):154-156.
[8] 朱佳慧.EPC工程总承包项目计价模式决策研究[D].重庆大学,2021.