International Journal of Mechanical Engineering
International Journal of Mechanical Engineering. 2022; 1: (3) ; 10.12208/j. ijme.20220042 .
总浏览量: 361
国家能源集团准能集团设备维修中心 内蒙古鄂尔多斯
*通讯作者: 刘云,单位:国家能源集团准能集团设备维修中心 内蒙古鄂尔多斯;
通过WK-35电铲生产过程中对行走系统进行理论分析,找到履带架幅板驱动轮安装位外侧安装耳变形失效的原因,利用焊接应力进行矫正试验达到预期效果,成功解决现场检修难题。
Through the theoretical analysis of the traveling system in the production process of WK-35 electric shovel, the reason for the deformation and failure of the mounting lug outside the mounting position of the driving wheel of the crawler frame web plate was found, and the welding stress was used for the correction test to achieve the desired effect, which successfully solved the problem of on-site maintenance.
[1] 王永胜.WK-35电铲行走履带链装置失效分析及预防[J].技术与市场,2020,27(03):133-134.
[2] 王树兵.WK-35电铲行走履带链装置失效分析[J].露天采矿技术,2019,34(02):98-101.
[3] 皮海平.WK-35电铲下盘分离变频驱动控制装置的应用[J].铜业工程,2018(03):101-104.