Journal of Engineering Research
Journal of Engineering Research. 2022; 1: (3) ; 10.12208/j.jer.20220057 .
总浏览量: 395
北京市南水北调大宁管理处 北京
*通讯作者: 孙凡,单位:北京市南水北调大宁管理处 北京;
通过梳理工程项目风险管理已有成果,结合北京市南水北调PCCP给水管道项目识别PCCP管道项目建设风险,在风险识别基础上构建PCCP项目风险评价指标体系,并运用模糊评价法计算风险评价权重,建立PCCP给水管道项目风险评价模型。评价结果表明:北京市南水北调PCCP给水管道工程属于一般风险等级,并根据项目风险评价结果,提出了风险应对措施。
By combing the engineering project risk management achievements, combined with the PCCP Beijing south-to-north water supply pipeline project to identify PCCP pipeline project construction risk, build PCCP project risk evaluation index system on the basis of risk identification, and use the fuzzy evaluation method to calculate the risk evaluation weight, establish PCCP water supply pipeline project risk evaluation model. The evaluation results show that the PCCP water supply pipeline project of Beijing South-to-North Water Diversion Project is a general risk level, and the risk response measures are proposed according to the project risk assessment results.
[1] 赵树帆.长距离输水管道工程建设工期影响因素探析[J].山西水利,2017(9).
[2] Jianhui X. The Social Security Risk Assessment and Emergency Management practice in the Kyrgyz Gas Pipeline Project[J]. Energy Conservation in Petroleum & Petrochemical Industry, 2017.
[3] 王雅萍.探析泵站出水管道水锤风险[J].水电水利,2018,002(006):P.82-83.
[4] 林俊雄,朱建国,李澄,等.城市山洪风险分析及规划应对[J].中国给水排水,2018, 034(023):124-129.
[5] 朱建华.水利水电项目风险管理浅析[J].水能经济,2016(06):121-121.
[6] 施凯.给水管道工程项目管理研究[J].商品与质量,2019,000(002):17,19.
[7] 俞红艳.给水管道工程项目管理研究[J].商品与质量,2017,000(028):289.